BKMBUILDING SOLUTIONS Free Consultation

Ground-Up Construction

From raw land to occupancy permit.

Site work, structure, envelope and interiors under one contract — a single accountable team from the first survey to your occupancy permit.

Commercial service

One contract from empty lot to open doors.

Ground-up work has the most places to lose money and time. We manage it as one scope: due diligence, permits, site servicing, structure, envelope, interiors and commissioning — with a fixed budget and a schedule you can plan a launch around.

  • Due diligence, zoning and development permits
  • Site servicing, grading and foundations
  • Structure, envelope and roofing
  • Interior build-out, commissioning and occupancy

What's included

What a ground-up build includes.

Every project is scoped and priced before we start.

Due diligence

Zoning, servicing and site constraints reviewed before you commit.

Permits

Development and building permits driven through to issuance.

Site & foundations

Servicing, grading, excavation and concrete.

Structure & envelope

Framing or steel, roofing, glazing and weatherproofing.

Interiors

Mechanical, electrical, finishes and fixtures.

Commissioning

Testing, deficiencies and occupancy permit in hand.

How it runs

How the work runs.

Site and lease review

We read the space, the lease and the landlord requirements before anything is drawn, so the scope matches what you are actually allowed to build.

Drawings and permits

Layouts, engineering where structure moves, and the development and building permits driven through the city by us.

Fixed, itemised price

A line-by-line quote before demolition, with long-lead equipment identified and the contingency named out loud.

Build and inspections

Trades sequenced around your opening date, with every inspection booked and cleared as we go rather than at the end.

Handover and occupancy

Deficiencies cleared, occupancy permit in hand, warranties and manuals collected and passed to you.

Before you buy the land

Due diligence is cheaper than a surprise.

The costs that derail ground-up projects are almost never in the building. They are in the ground and the paperwork: servicing that has to be brought from further away than anyone assumed, a geotechnical report that changes the foundation, a stormwater requirement, a utility easement running through the footprint, or a use that needs a land use redesignation nobody priced.

We front-load that work. A few weeks of due diligence before you commit is what turns a ground-up build from a gamble into a schedule.

  • Zoning, permitted use and whether a redesignation is needed
  • Geotechnical, survey and existing servicing to the property line
  • Stormwater, grading and offsite requirements
  • Utility easements, setbacks and what they do to the footprint

Common questions

Questions we get asked most.

Anything not covered here, just ask on the call.

How long does a ground-up project take?

Nine to eighteen months from first drawings to occupancy for most commercial buildings, and the approvals are usually the longest single stretch. A development permit, a building permit and utility approvals all run on their own clocks, which is why we start them in parallel.

Can you take it from raw land?

That is what this service is. Due diligence, design, approvals, site servicing, structure, envelope, interiors and commissioning under one contract and one point of contact.

Do you work with our architect?

Happily. Where you already have a designer we build to their drawings and manage the trades and approvals. Where you do not, we bring the architectural and engineering team in as part of the contract.

How firm is the price on a ground-up build?

Firm for the scope we agree, with a named contingency for what the ground turns up. Anyone quoting a fixed number on raw land before the geotechnical report is guessing, and the difference shows up later as a change order.

Start your project

Planning a ground-up build?

Free consultation · honest estimate · no pressure.